Recovery depends on what made the building unsafe and who is legally responsible for that cause. Russia’s Supreme Court set aside an award of roughly RUB 93.4 million against a developer for rehousing residents and surveying an apartment building in Muravlenko. The trial court will reconsider those claims alongside the claims against the original developer.
The operative part was announced on 11 November 2026. The full ruling, No. 304-ЭС26-11983, is dated 23 November; Pravo.ru reported it on 25 November.
Why the court sent the case back
A replacement developer took over the shared-construction agreement in 2017. Defects appeared after handover. The building was declared unsafe and the residents were relocated. The local administration claimed the cost of relocation and fixing the defects. The municipal property authority claimed the cost of a technical survey. The appeal court awarded RUB 93,236,004.75 for rehousing and RUB 200,657.57 for the survey against the replacement developer.
The regional commercial cassation court let those awards stand while sending the repair-cost claim and the claims against the original developer back for a new hearing. The Supreme Court’s Economic Disputes Panel held that those claims depend on the same factual question: what made the building unsafe? The design, nearby pile driving and the way the building had been maintained were among the issues requiring examination. The panel set aside the awards against the replacement developer and the allocation of the state filing fee. It left the rest of the regional cassation ruling in place. The trial court must now determine who, if anyone, is liable and how much they owe.
How the warranty applies after a change of developer
The agreement in this case provided a five-year warranty. Under Article 7 of Federal Law No. 214-FZ, discovering a defect within the applicable warranty period affects who must prove what. A developer relying on statutory grounds for exemption must establish them. The court still needs to identify the source of the defect and connect each claimed cost to the relevant breach or harmful act.
The terms of the transfer determine which obligations the replacement developer takes on. The original developer may remain liable for its own earlier breaches. Whether the replacement developer answers for the original developer’s acts depends on the law and the agreement. Joint and several liability requires a legal basis of its own. Check the contract and the version of the law applicable to your project before using the five-year figure from this case.
What evidence to assemble
- Collect the shared-construction agreement, the transfer agreement, any amendments, the handover records and the warranty terms. Use them to identify who was responsible at each stage.
- Put the defects and nearby works on a timeline. Keep inspection reports, dated photographs, correspondence, and design and as-built records. Ask any expert to address what caused the deformation, when it developed and whether the works at each site contributed.
- Document each category of expenditure separately. Gather contracts, estimates, completion records, payment evidence and explanations of why the relocation, survey or repair was necessary. Link each item to the cause identified by the evidence.
A decision declaring a building unsafe helps establish its condition. Evidence about the causes and the costs supports the choice of defendant and the amount claimed. For a related example, see how to document property damage and related costs.
Did the Supreme Court order both developers to pay?
No. A new hearing will determine the legal basis of each company’s liability. The handover alone does not establish that both caused the same loss.
Sources
Supreme Court ruling No. 304-ЭС26-11983 in Russian · Pravo.ru, 25 November 2026. Full-text copy.